iManager U2000 硬件安装指南 (N610E)-(V100R002C01_02).docx
《iManager U2000 硬件安装指南 (N610E)-(V100R002C01_02).docx》由会员分享,可在线阅读,更多相关《iManager U2000 硬件安装指南 (N610E)-(V100R002C01_02).docx(53页珍藏版)》请在三一文库上搜索。
1、iManager U2000 Unified Network Management SystemHardware Installation Guide (N610E)iManager U2000 统一网络管理系统硬件安装指南(N610E)Issue: 02Date: 2010-09-24文档版本:02发布日期:2010-09-24HUAWEI TECHNOLOGIES Co., Ltd.Installation Process安装流程Start开始Page 2 Preparation for InstallationPage 4Hardware ConfigurationPage 9Intro
2、duction to Devicesto 3安装准备to 8机柜配置设备简介Page 11Installing the Cabinet安装机柜Page 12Installing ComponentsInside the Cabinetto 18安装机柜内部设备Page 19Installing the PowerCablesto 26安装电源线Page 27Installing the SignalCablesto 34安装信号线Page 35Checking the Installationto 37安装后检查End结束1Preparation for Installation 安装准备1
3、Notice使用须知This document describes how to install the hardware components, how to connect the power cables and signal cables, and how to check the connections when the SUN M4000, SUN T5220, IBM BladeCenter E, HP DL380 G6, or HP DL580 G5 server acts as the server of the single-server system (centraliz
4、ed), the single-server system (distributed), remote HA system (centralized), and remote HA system (distributed).The cabinet configuration, power cable connection, and signal cable connection that are detailed in this document are written according to the standard configuration. If the actual on-site
5、 installation requirements are inconsistent with this document, handle the requirements according to the actual situation. Unless otherwise specified, the slide rails installed in the cabinet are used for the corresponding devices. The models of the corresponding floating nuts and panel screws are M
6、6.本文档提供了在配置 SUN M4000、SUN T5220、IBM BladeCenter E、HP DL380 G6、HP DL580 G5服务器作为单机集中式系统、单机分布式系统、异地集中式高可用性系统和异地分布式高可用性系统情况下,各硬件组件的安装、电源线缆连接、信号线缆连接及检查方法。本文档涉及的机柜配置、电源线连接方案、信号线连线部分等内容均按照标准配置写作,现场如果遇到实际发货与手册中不一致的情况,请根据实际情况处理。如果没有特殊说明,所有设备对应的滑道均使用机柜中已经安装的滑道,使用的浮动螺母和面板螺钉的型号均为M6。2Document资料准备 PreparationThe
7、following documents must be prepared before the installation: Customer Preparation Guide to iManager U2000 Installation This document can be obtained from http:/. N610E Cabinet Installation Guide (V2.0)This document is delivered with the cabinet.在安装之前,请准备以下资料:iManager U2000工程安装客户准备指导书获取路径:http:/N610
8、E Cabinet Installation Guide & N610E机柜安装指南-(V2.0)获取路径:随机柜发货23 Tools安装工具Measuring TapePhillips Screwdriver钢卷尺十字螺丝刀Torque WrenchSocket Wrench力矩扳手套筒扳手COAX Crimping ToolCable Cutter同轴电缆压线钳电源线剪线钳Diagonal PliersRJ45 Crimping Tool斜口钳网线钳Network Cable TesterESD Gloves网线测试仪防静电手套Flat-head Screwdriver一字螺丝刀Hydra
9、ulic Pliers液压钳Wire Stripper剥线钳Multimeter万用表ESD Wrist Strap防静电手腕3Hardware Configuration机柜配置1Standard layout of the cabinet when the M4000 server is installed安装M4000 服务器时机柜标准配置图Power Distribution Box 配电盒(3U)LAN Switch-3(1U )Cabling trough 走线框(1U )LAN Switch-2(1U )Cabling trough 走线框(1U )LAN Switch-1(1U
10、 )Cabling trough 走线框(1U )Filler panel 假面板(3U )Nonstandard filler panel 非标假面板(1U)Filler panel 假面板(1U )Disk array-2磁盘阵列-2 (2U )Filler panel 假面板(1U )Nonstandard filler panel 非标假面板(1U)Filler panel 假面板(1U )Disk array-1磁盘阵列-1 (2U )Filler panel 假面板(1U )Filler panel 假面板(1U )Filler panel 假面板(1U )Filler panel
11、 假面板(1U )Filler panel 假面板(2U )Filler panel 假面板(2U )M4000-2 (6U )Filler panel 假面板(1U )Filler panel 假面板(2U )The cabinet configuration has passed the strict verification, and can meet the requirements for the power consumption and heat dissipation. Install the M4000 server by strictly complying with th
12、e left installation flowchart.机柜配置是经过严格验证,满足功耗,散热等要求。安装时请严格按照左图安装。Filler panel 假面板(2U )M4000-1(6U )4Standard layout of the cabinet when the T5220 server is installed 2 安装T5220 服务器时机柜标准配置图1Power Distribution Box 配电盒(3U)Nonstandard filler panel 非标假面板(1U)Filler panel 假面板(1U )LAN Switch-2(1U )Cabling tr
13、ough 走线框(1U )LAN Switch-1(1U )Cabling trough 走线框(1U )Filler panel 假面板(1U )Nonstandard filler panel 非标假面板(1U)Filler panel 假面板(1U )Nonstandard filler panel 非标假面板(1U)Filler panel 假面板(3U )Cabling trough 走线框(1U )Filler panel 假面板(1U )Filler panel 假面板(3U )Cabling trough 走线框(1U )Nonstandard filler panel 非标假
14、面板(1U)KVM (1U )Nonstandard filler panel 非标假面板(1U)Filler panel 假面板(1U )Nonstandard filler panel 非标假面板(1U)Filler panel 假面板(1U )Nonstandard filler panel 非标假面板(1U)Filler panel 假面板(2U )Filler panel 假面板(1U )Filler panel 假面板(2U )Filler panel 假面板(1U )Filler panel 假面板(2U )T5220-2(2U )Filler panel 假面板(2U )Fil
15、ler panel 假面板(2U )T5220-1(2U )Filler panel 假面板(1U )The cabinet configuration has passed the strict verification, and can meet the requirements for the power consumption and heat dissipation. Install the T5220 server by strictly complying with the left installation flowchart.机柜配置是经过严格验证,满足功耗,散热等要求。安装
16、时请严格按照左图安装。53Standard layout of the cabinet when IBM BladeCenter E is installed安装IBM Blade Center E时机柜标准配置图Power Distribution Box 配电盒(3U)Filler panel 假面板(1U )LAN Switch(1U )Cabling trough 走线框(1U )Filler panel 假面板(3U )Filler panel 假面板(6U )Filler panel 假面板(6U )Filler panel 假面板(3U )Filler panel 假面板(2U
17、)Disk array-3磁盘阵列-3 (2U )Filler panel 假面板(2U )Disk array-2 磁盘阵列-2 (2U )Filler panel 假面板(2U )Disk array-1磁盘阵列-1 (2U )Large-capacity optical disk 大容量光纤盘(1U )Blade Center E(7U)Filler panel 假面板(2U )The cabinet configuration has passed the strict verification, and can meet the requirements for the power
18、consumption and heat dissipation. Install the IBM Blade Center E server by strictly complying with the left installation flowchart.机柜配置是经过严格验证,满足功耗,散热等要求。安装时请严格按照左图安装。6Standard layout of the cabinet when DL380 G6 is installed 4 安装DL380 G6时机柜标准配置图1Power Distribution Box 配电盒(3U)Filler panel 假面板(1U )Fi
19、ller panel 假面板(1U )LAN Switch - 2(1U )Cabling trough 走线框(1U )LAN Switch - 1(1U )Cabling trough 走线框(1U )Filler panel 假面板(1U )Filler panel 假面板(1U )Filler panel 假面板(1U )Filler panel 假面板(2U )DL380 - 4(2U )Cabling trough 走线框(1U )Filler panel 假面板(2U )DL380 - 3(2U )Cabling trough 走线框(1U )Nonstandard filler
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- iManager U2000 硬件安装指南 N610E-V100R002C01_02 硬件 安装 指南 N610E V100R002C01_02
链接地址:https://www.31doc.com/p-8863309.html