1、安装工程一切险保险合同 (中英文) CONTRACT OF ERECTION ALL RISKS INSURANCE 安装工程一切险投保单 erection all risks insurance application保单号 policy no.本投保单由投保人尽可能如实地、详细地填写并签章后作为向本公司投保安装工程险的依据。本投保单为该工程保险单的组成部分。 the applicant is required to fill in following items with utmost faith and as d etailed as possible, and affix signat
2、ure to this application, which shall be the basis ofappli cation to the company for erection all risks insurance and constitute an integral part of the insurance p olicy covering the project.1.工程关系方的名称和地址name and address of parties toproject工程所有人principal承包人contractor工程分包人sub-contractor其他关系方other pa
3、rty(ies)concerned2.被保险人名称和地址: name and address of theinsured:3.被保险工程名称title ofcontract/project:4.被保险工程地点 location oferection:5.被保险项目、保险金额赔偿限额及每次事故免赔额insured items、sums insured/limits of indemnity and deductible for any oneaccident:5.1物质损失 material damage项目投保金额每次事故免赔额 insured items sums insured deduc
4、tible for any one accident安装工程erection works(1) 安装工程设备价(包括设备价、运费、保费、关税等)value of equipment to beerected (including value of equipment, freight, insurancepremium and customs duty, etc.)(2) 安装费 cost of erection(3) 土建项目 civil engineering work(4) 每次事故指不论一次事故或一个事件引起的一系列事故 the words any one accidemt shall
5、 mean any one accident or series of acciden t arisingout of one event.工程所有人或承包人在工地上的其他财产 principals or contractors propertyexisting on the site施工用机具及设备(详见所附清单) construction plant andequipment (according to the attached list)清除残骸费用 removal of debris expenses灭火费用fire extinguishment expenses专业费用profess
6、ional expenses其他费用 other expenses总保险金额total sum insured5.2特种危险赔偿限额 limits of indemnity for special risks赔偿限额 limitsof indemnity(不超过保额 80% limit to 80% of suminsured)危险种类 risks地震、海啸earthquake, tsunami洪水、风暴、暴雨flood, storm, tempest每次事故免赔额(不低于损失的 20%) deductible for any one accident (not less than 20% o
7、f loss)5.3费率premium rate5.4总保险费 total premium6.保险期限 period of insurance6.1安装期:个月,自年月日起至年月日止 erection period: months, from to6.2试车期(可独立分开的项目单独试车)个月,自年月日起至年月日止 testing or commissioning period: months, from to6.3是否投保有限责任保证期?如是,请列明是否maintenance visits period is to be covered? if so, please stateyesno保证期
8、个月,自年月日起至年月日止 maintenance visits period: months, from to7.是否投保第三者责任?如是,请列明是否whether third party liability is to be covered? if so, please stateyesno7.1每次事故赔偿限额 limit of indemnity for any one accident7.2累计赔偿限额 limit of indemnity in aggregate during period of insurance7.3每次事故物质损失免赔额 deductible of mate
9、rial damage for any one accident7.4费率及保险费 premium rate and premium8.被安装机器设备的情况 condition of the machinery and equipment to be erected8.1项目主体 principle work8.2如系单项设备,逐一列明名称、型号、技术指标、制造商及价值;如系成套设备,列明主要设备的名称、技术指标、制造商及价值;如有旧品,逐一列明名称及价值 for single-item equipment, specify description, type, technical stand
10、ard, manufacturerand value; for complete sets of equipment,specify names, technical standard, manufacturerand value of the principle equipment; forused machinery, ifany, specify descriptionsand value separately8.3安装前设备储存地点、条件及保管方法 location, condition and methodof temporary storage of the equipment p
11、rior the erection8.4主体工程施工方法及起止时间 construction method of principle partof project and the date ofcommencement andexpiry9.工地及附近的自然条件 natural conditions on and arround thework-site:9.1地形特点topograghical features9.2地质及底土条件 geology and subsoil conditions9.3地下水水位 level of underground water9.4最近的河、湖、海的名称、距
12、离和以往最低、一般和最高水位 name and distance of the nearest river,lake and sea and their records of the lowest,normal and highest water levels9.5以往最大降雨量记录 past record of the maximumrainfall(24小时,月年 within 24 hours,month/year)9.6以往遭受自然灾害(如洪水、台风)记录 past record of occurrences ofnatural calamities(such as flood, ty
13、phoon)10.该工程为新建改建扩建the project isnew projectreform/up-gradeextented11.安装工程在建筑物内进行还是露天进行?建筑物内露天the erection work will be carried out indoor or utdoorindooroutdoor12.施工过程中可能会造成损坏他人财产的分布情况 distribution of third partys properties which may be damaged during the periodof erection13.施工承包人是否有同类工程的施工经验或同类施工
14、方法的经验?是否is the contractor experienced in this type of work or erectin methodyesno14.工程关系方中的任何一方是否已向其他保险公司投保与本工程有关的保险?any insurance relating to this project has been effected with other insurancecompany by any patries toprojyes ect?是保险公司保险种类insurance companycoverage of insurance保险金额否sumsinsuredno15.特
15、别条款 special porvisions:16.备注 remarks:请随同本投保单提供下列文件 this application shall be submitted together with the following documents:(1)工程合同 consrtuctioncontract(2)承保金额明细表 breakdown of the contract value(3)工程设计书 blueprint of theporject(4)工程进度表 progress schedule of the erection site(5)工程地质报告 geological repor
16、t of erection site(6)工地概图 sketch of the project site投保人及被保险人兹声明所填上述内容属实,对贵公司就安装工程一切险条款及附加内容(包括责任免除部分)的说明已经了解,同意按照该条款和附加内容投保安装工程一切险。 i/we(the applicant & the insured) to hereby declare that the above contents are truly filled in, and that i/we have understood the companys explanation on theclauses of
17、 erection all risks insurance and its additional contents (including exclusions), and that i/we agree to apply for erection all risks insurance subjectto the above-menti oned clauses and its additional contents.投保人及被保险人(签章)电话 signatures of the applicant & the insuredteleph one地址日期 addressdate以下内容由保险
18、公司填写 for office useonly经办人及日期核保人及日期上文已完。下文为附加公文范文,如不需要,下载后可以编辑删除,谢谢! 全县2016年一季度经济形势分析报告 年初以来,全县上下紧紧围绕“稳中求进、提质增效”的总基调,按照中央和省、市的“四个着力”全链条部署,以供给侧结构改革为突破口,统筹做好稳增长、调结构、惠民生、防风险各项工作,主要经济指标处于合理区间,工业运行总体平稳,消费市场稳定增长,产业结构持续优化,质量效益不断提升,经济发展实现平稳开局。 一、主要经济指标预计完成情况 地区生产总值,全年任务xxx亿元,增长x%;一季度预计完成xx亿元,增长x%,完成年计划的xx%;
19、 固定资产投资,全年任务xxx亿元,增长x%;一季度预计完成xx亿元,增长xx%,完成年计划的xx%; 一般公共预算收入,全年任务xx亿元,增长xx%;一季度完成xx亿元,增长xx%,完成年计划的xx%。其中:财政口径税收收入,全年任务xx亿元,增长xx%;一季度完成x亿元,增长xx%,完成年计划的xx%; 社会消费品零售总额,全年任务xx亿元,增长x%;一季度预计完成xx亿元,增长x%,完成年计划的xx%; 规模以上工业增加值,全年任务xx亿元,增长 x%;一季度预计完成xx亿元,增长x%,完成年计划的xx%; 商品房销售额,全年任务xx亿元,增长x %;一季度预计完成x亿元,增长xx%,完
20、成年计划的xx%; 实际利用外资,全年任务x亿美元;一季度预计完成xx亿美元,完成年计划的x%; 外贸出口,全年任务x亿美元,增长xx%;一季度预计完成x亿美元,增长xxx%,完成年计划的xx%; 融资总量,全年任务xx亿元;一季度预计完成x亿元,完成年计划的xx%; 农村常住居民人均可支配收入,全年任务xxxxx元,增长x%;一季度预计完成xxxx元,增长x%,完成年计划的xx%; 项目建设完成情况: 签约引进亿元以上项目,全年任务xx个;一季度完成x个,完成年计划的xx%。其中,工业x个,服务业x个; 新开工亿元以上项目,全年任务xx个;一季度完成 xx 个,完成年计划的xx%。 其中,工
21、业x 个,农业x个,服务业 xx个; 竣工亿元以上项目,全年任务xx个;一季度完成xx个,完成年计划的 xx%。其中,工业x个,农业x个,服务业x个。 二、存在的突出问题及原因 1.投资增长压力仍然较大 一是储备重大项目太少。无论是工业项目,还是服务业项目具有支撑性、税源性的大项目太少,特别是具有辐射和拉动作用的核心项目仍没有真正形成。今年我县重点推进10亿元以上的储备项目只有x个,高科技含量、高附加值的项目寥寥无几,延伸产业链条、促进产业结构优化升级的项目几乎没有。具有牵动力强的工业产业集群仍没有形成,工业经济整体运行质量不高,对我县财政的支撑作用不强。 二是新开工项目体量偏小。一季度,全县
22、新开工亿元以上产业项目xx个,同比增加x项;计划总投资xx亿元,同比增加x亿元。新开工项目全部为5亿元以下的项目。10亿元以上大项目没有实现开工。 三是项目产业分布不均衡。一季度共实施xx项亿元以上重点产业项目,计划总投资xxx亿元,实际完成投资xx亿元,同比增长x%,占固定资产投资的xx%。其中,新开工项目xx项,完成任务目标的xx%,完成投资x亿元;续建项目xx项,完成投资xx亿元。从三次产业看,第一产业未能形成投资;第二产业投资预计实现x亿元,同比增长x %,占投资总额的xx%;第三产业投资预计实现xx亿元,同比增长xx%,占投资总额的xx%。 四是要素保障制约严重。信贷规模收缩、政府融
23、资渠道收紧等带来项目建设资金紧张问题比较突出,一些项目摊子铺的太大,资金不足,工程进展较慢,例:xx项目;土地指标、环境容量不足的问题严重影响了部分项目的推进速度,一些项目受土地指标和办理土地手续时间较长等因素影响,导致因土地未落实而无法开工,例:xx项目;一些项目在征地、拆迁等方面存在诸多困难和问题,影响了开工建设,例:xx项目。 五是部分未批先建项目未纳入统计库。由于施工许可、土地、环评等相关手续办理滞后,致使项目未能及时入库,造成统计数据与实际投资额不同步。目前,全县在建的xx个亿元以上产业项目中,有xx个项目未入库,占全部项目的xx%。xx个未入库项目计划总投资xx亿元,已完成实际投资
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 安装工程一切险保险合同 中英文 安装 工程 一切 保险合同 中英文
链接地址:https://www.31doc.com/p-2042081.html