《w坡脚水库施工管理工作报告(好).doc》由会员分享,可在线阅读,更多相关《w坡脚水库施工管理工作报告(好).doc(28页珍藏版)》请在三一文库上搜索。
1、les disposicions pertinents de lestat a la verticalitat seguretat supervisi i gesti departaments per avaluar operacions especials unitat nacional ha aconseguit qualificat personal format certificat abans de participar en el corresponent treball o gesti. 7, ls de la unitat dequipament especial ha de
2、ser seguretat equip especial dequipament especial operador educaci i formaci, i operadors dequips especials disposen del material necessari especial per assegurar la seguretat operacional de coneixement. 14, pont de normes de seguretat operaci 1, capit, el monitor i els principals tipus de treballad
3、ors ha entrenat a correus. Unitat 2, el treballador ha de tenir suficient energia, temps de treball no pot excedir de 12 hores al dia. 3, personal de la unitat est estrictament prohibit beure. 4, est estrictament prohibit per a erecci mquina de biga moviment longitudinal i lexterior a la nit. 5, un
4、pont en ambds costats de lrbita longitudinal alta els requisits de nivell, per mantenir un equilibri. Els requisits lateral pista datletisme i un control estricte de lespai, tres pistes ha de ser parallel. 6, installaci de biga de formig de biaix pont, poca Erector, 0, 1, 2a fase, deixat per trontol
5、len i tornada, limport es calcula segons els angles oblics i lamplada de les rodes desquerra i dreta, per tal que els cotxes poden crrer sobre una pista horitzontal. 7, pont de desplaament longitudinal per fer tots els preparatius, un cop a lloc, Midway pausa el menys possible. 8, instal lar superio
6、r i inferior pendent vertical, desplaament longitudinal de mquina pont ha de tenir les mesures per evitar la diapositiva, com ara filet triangular rodes anterior i posterior per a la protecci, espai especial columna 1, molt a prop de la biga, al control de latenci. 9, un pont penjant penjant de prov
7、ar que la installaci de la mquina ha de ser corregut, tamb es pot utilitzar desprs de la crrega de la prova de la biga de formig i pont erigir mquina i llavors crrer per comenar la feina dinstallaci. 10, quan erigir installaci mquina, comprovacions de seguretat regular, una seguretat integral compro
8、va cada installaci un forat ha de ser trobat per aturar el treball i tractada puntualment amb funcionament intermitent, treball mecnic i elctric amb malaltia no estan permeses. 11, la sobrecrrega doperaci dinstallaci no s perms. Nivell, ha de ser enfortida sobre terreny prou slida, coixinets Outrigg
9、er cal afegir per a incrementar la capacitat de la terra. (2) velocitat del vent s superior a 13.8M / s (equivalent a 6 vent), grua no deures, quan la longitud de bra s superior a 50 m quan la velocitat del vent no podr ser superior a 9.8M / s (lequivalent de 5 vent). I prestar atenci als efectes en
10、 lestabilitat de la grua, vent no penjar-se, davant el vent t alguns perills, alant el contrari. (3) estrictament segons la capacitat nominal quan laixecament de la taula i aixecar loperaci corba desociety; after after 60 years of development, the socialist society more full of life And vigor. The r
11、emarkable sign is in China adhere to the basic principles of scientific socialism, not lost ancestors, always adhere to dialectical materialism and historical materialism as the theoretical foundation, adhere to the to the realization of communism as the supreme ideal, adhere to the Party of the wor
12、king class as the core of leadership, insist to liberate and develop productivity is the fundamental task, adhere to represent the most numerous peoples fundamental interests, adhere to public ownership and according to work, distribution is the basis of the socialist economic system, adhere to the
13、position of the people as masters of the country is the essential characteristic of the socialist democratic politics, adhere to reform and improve the socialist system and institutional mechanisms, and so on. At the same time, our country socialist And with distinct Chinese characteristics, the roa
14、d of socialism with Chinese characteristics, the system of theories of socialism with Chinese characteristics and the socialist system with Chinese characteristics, are deeply rooted in the creative practice of hundreds of millions of peoples indomitable, timely response to practice innovation theor
15、y calls, rich heritage of both historical and cultural traditions of the Chinese nation, and let the Chinese people love to see and hear the Chinese style and Chinese style, comply with the requirements of the development of the times, reflect the common aspiration of the people, with distinct chara
16、cteristics of the practice, theoretical characteristics, national characteristics, characteristics of the times. Therefore, it can always maintain the vigor and vitality, and always guide contemporary China along the right direction stride forward. So we must always hold high the great banner of soc
17、ialism with Chinese characteristics unswervingly. On the other hand, Chinas socialist society is still in primary stage, which is Chinas construction of socialist modernization insurmountable historical stage, the need for hundreds of years time. Chinas socialist system was born in semi colonial and
18、 semi feudal society, productivity level is far behind in the developed capitalist countries, which determines the our country must experience a long primary stage, to realize in other countries under the conditions of capitalism to achieve industrialization and production in the market, socializati
19、on and modernization. Today, our country socialism has made remarkable tremendous To accelerate the pace of achievements, but our country fundamental realities of the country is still has a large population, weak thin, development is not balanced. Chinas economy has leapt to the world, but the per c
20、apita gross domestic product is still ranked in the world the 90%; economic sustained and rapid development, but the development is not balanced, coordinated, can not be continued problems are still prominent, the transformation of economic developmentManipulator is now used as a industrial robots i
21、n use, the control objectives often appear often in industrial automation. Industrial automation technology has gradually matured, as mature a technology line has been rapid development in industrial automation as a separate subject. Manipulator application began to filter into welding, logistics, m
22、echanical processing, and other industries. Especially at high or very low temperatures, full of poisonous gases, high radiation case, robot in similar circumstances showed great use also brings great convenience to the staff. Precisely because of this robot to get peoples attention began to be a hi
23、gh degree of development. Labor rates, working conditions, labor intensive aspects of promoting development. Both at home and abroad to develop the PLC (programmable logic controller) is in various special circumstances and under special conditions set for mechanical devices. Now turned on the devel
24、opment of the microelectronics automatic control technology and the rapid development of the trains, the success of PLC hardware software and simulation control win big and successful development, now continues to develop as a factory automation standards. Because robots are good development of the
25、technology makes a good optimization of productive capital, and robot shows this unique advantages, such as: has good compatibility, wide availability, hardware is complete, and programming that can be mastered in a short time, so in the context of industrial PLC applications became ubiquitous. Mani
26、pulator in many developed country agriculture and industry has been applied, such as the use of mechanical harvesting large areas of farmland, repeated operations on the high-speed line that uses a robotic arm, and so on. Today, the high level of automation combined with restrictions on the manipula
27、tor development level is slightly lower than the international. The design is mainly arm welding machine by PLC Automation control. This of design let designers on in school by learn of has a must of consolidation, understand has some usually didnt opportunities awareness in world range within some
28、leading level of knowledge has has must awareness, hope designers can in yihou of design in the can success of using in this design in the proceeds of experience 1.2 manipulator in both at home and abroad of research profile automation mechanical arm research began Yu 20th century medium-term, after
29、 years with with computer and automation technology of development, Makes mechanical arm on the Grand stage of industrial automation and shine, gradually became an industrial evaluation standards, and its importance can be seen. Now original robotic arm spent most of mass production and use on the p
30、roduction line, which is programmed robotic arm. As the first generation of manipulator position control systems main features, although not back several generations that can detect the external environment, but can still successfully complete like welding, painting, delivery as well as for material
31、s simple movements. Second generation mechanical arms are equipped with sensors and manipulators have the environment there is a certain amount of sense, when the mechanical arm is to use the program as a basis. Difference is that the robot begand1 工程概况1.1 工程概述陆川县坡脚水库位于陆川县乌石镇坡脚村附近在九洲江水系坡脚河的上游,距陆川县城区
32、约20Km,距乌石镇政府所在地约5km地处东经11016,北纬2208,跛脚河为救洲江的一级支流,库内林木茂密植被良好,本库流域为匠陵山区,高程一般的130m250m之间,十壤为红砂粘土。坡脚水库控制集雨面积为9.27Km2,河床平均比降为19.89,主河流长度为5.16Km。总库容887m3,是一座以灌溉为主,兼顾防洪、发电、养殖等综合利用的小(1)型水利工程。坡脚水库规模为小(1)型水库,工程等别为等,主要建筑物级别为4级,设计洪水标准为50年一遇洪水设计,500年一遇洪水校核。坡脚水库枢纽建筑物主要由大坝、溢洪道、输水隧洞、坝后电站、管理房等组成。1.2 水文地质条件1.2.1 水文气象
33、条件坡脚水库处于北回归线以南的低纬度,受东亚季风环境控制,属于热带季风气候。主导风向为东南和西南风,台风多发于5月10月。夏半年盛吹偏南风,带来海洋暖湿空气,形成高温多雨的海洋性气候;冬半年受季风影响,多吹偏北风,形成低温干燥的气候。年均气温21.4,水库库区多年平均降水量为1900mm,多年平均径流量为1022万m3。1.2.2 工程地质条件坡脚水库库区为丘陵地貌,库周山坡自然坡度约2045 。库区出露地面的地层只要为第四系残坡积含砂粘土和白垩纪陆川超单元大桥单元(K1D)中粒斑状黑云二长化岗岩。 库区地形封闭条件较好,地下分水岭高于库水位,地层岩性透水性小,无大的断裂通过库区,水库不存在向
34、邻谷渗漏问题;库区周围大部分为土质边坡,边坡由全风化花岗岩组成,溢洪道进口对面库岸出现几处崩塌,范围较大,库岸存在不稳定性;地表固体径流较少,河水含沙量不大。1.3 对外交通条件坡脚水库距陆川县城区约20Km,距乌石镇政府所在地约5km,有村级、二级公路相通,交通便利,水库施工场内场外交通方便。1.4 项目主要建设内容本次坡脚水库除险加固工程主要建设项目内容:(1) 大坝加固工程;(2)高压旋喷灌浆工程;(3)溢洪道加固工程;(4) 防汛抢险公路维修工程;(5) 房屋建筑工程等。2 工程投标2.1 投标过程我公司根据有关招标公告信息,决定参加坡脚水库除险加固工程的投标,并于2010年12月12
35、日进行投标报名。我公司于2010年12月12日购买该工程招标文件及招标图纸,并派代表参加了招标单位召开的标前会,听取了招标单位对本工程的介绍及设计单位对坡脚水库除险加固工程设计、施工技术要求的介绍,于2010年12月16日并踏勘考察了工地现场,了解了当地市场材料价格。我公司在认真仔细研究工程招标文件的投标须知、合同条件、技术条款、设计图纸、工程量清单及其他有关文件后。通过计算确定合理的投标报价,制定先进的施工措施,编制投标文件。我公司于2011年1月18日提交了投标文件,并派有关人员参加了开标会, 2011年1月26日我公司收到招标单位发出的中标通知书,由我公司中标承包陆川县坡脚水库除险加固工
36、程施工建设任务。我公司于2011年2月20日与项目法人签订了施工承包合同。2.2 投标书编写原则我公司遵照广西水利和地方电力建设施工招投标管理暂行规定,踏勘工地现场、研究招标文件的投标须知、合同条件、技术条款、工程招标图纸、工程量清单和其他有关文件之后,编写了本标段的投标文件。投标文件包括下列内容:投标文件商务部分及投标文件技术部分,商务部分包括投标书前附表、投标报价书、投标保证金、法定代表人资格证书或企业法人营业执照、授权委托书、具有投标报价的工程量清单及报价表、投标辅助资料(包括投入本合同工作的施工队伍简要情况表、投入本合同工作的项目经理简历表、投入本合同工作的管理人员表、主要施工机械进场
37、计划表、劳动力进场计划表、材料进场计划表、试验、测量等检测仪器进场计划表、拟分包情况表及有关证件或证明材料的复印件);技术部分包括投标人对招标文件要求的响应性内容的承诺及施工组织设计(包括施工方案、施工进度计划、工期保证措施、关键部位工程质量保证措施和施工技术措施)。于2011年1月18日递交了投标文件。投标文件是按照招标文件精神编制的,工程承包方式为单价承包,我公司以人民币3467834.00元中标,并承担该工程的施工及保修。投标文件的报价依据是:(一)国家、自治区有关招标及工程造价管理的规定;(二)工程所在地建筑材料市场价格;(三)工程量清单、投标须知、合同条款、技术条款和图纸;(四)定额
38、和取费标准(1)广西区水利厅,区发改委及区财政厅桂水基200738号通知联合发布的广西壮族自治区水利水电设计概(预)算编制规定和广西水利水电工程概(预)算系列定额。(2)广西区水利厅以桂水基(2004)46号文发布关于在我区水利水电建设工程实行建筑意外伤害保险制度的通知。3 施工进度管理3.1 施工总布置3.1.1 施工布置原则合理的施工布局对加快施工进度、提高工程质量,避免各施工工序间的相互干扰非常重要。为了使工程施工有条不紊地进行,施工准备期间详细察看了现场,根据现场条件,特拟定如下施工布置原则:(1)因地制宜,合理使用场地。(2)场地划分和布局既要方便生产、易于管理、便于生活,又要符合国
39、家有关安全、防火、卫生、环保等专门规定。(3)一切施工设施的布置,必须满足各项目主体工程施工的要求,适应各个施工时期的特点,相互协作配合,避免干扰影响,特别不能影响主体工程的施工和运转。(4)根据本工程的特点和实地情况,对施工道路、用水用电、值班室、生活临时住房、仓库、砼搅拌站与砂石堆料场等进行综合布置。3.1.2 施工总体平面布置(1)施工总体布置陆川县坡脚水库除险加固工程主坝交通基本方便,根据现有的场地条件和发包人的规划,结合场内外交通线路,按照工程施工的需要,进行施工生产、生活营地的规划、设计、修建与管理。1、充分考虑招标文件关于施工期安全、环保和文明施工方面的要求;2、施工营地规划做到
40、因地制宜,充分利用地形和现有的交通条件,临建设施布置整齐、合理和美观;3、施工营地规划本着有利于生产、方便生产、易于管理的原则布置,并严格执行有关安全、消防、卫生和环境保护等的专门规定;4、施工布置做到能充分发挥施工工厂设施的生产力,满足施工总体进度和施工强度的要求;5、施工营地内各功能区分开布置,查对独立,尽可能减少彼此作业时的相互干扰;6、施工生产、生活营地设置有效的防护和排水系统,满足场地的防护和排水要求。(2)施工总体布置的基本条件 1、施工用水:施工用水可直接自坡脚水库中抽取到施工现场。2、施工用电:施工用电可从附近村屯电网连接,电源可以满足施工要求。3、施工用地:坡脚水库利用右坝首
41、平地和左坝首平地及溢洪道进水口平地属于施工用地。4、施工弃渣、弃土和废水排放 施工时将施工的废渣、开挖的弃土运到监理指定的地点堆放;废水排放:将施工废水先挖一条沟排水,将水排到规定的地点,不能排出的水,采用抽水机抽出去。(3)施工布置(1)布置条件与依据1)利用施工现场的位置、范围及条件,进行本合同工程施工阶段的施工总平面布置;2)布置时,将充分考虑利用当地的加工、物质供应、修配及劳务、运力等有利条件;3)严格执行技术条款和有关规程、规范;4)充分利用本公司以往及现在类似工程的施工经验、装备水平、科研及工法成果等。5)本工程施工部署和主要建筑物施工方案。6)本工程施工总资源计划和施工设施计划。
42、7)本工程施工用地范围和水电源位置,以及项目安全施工和防火标准。(2)布置原则1)充分利用业主为本合同工程提供的场内外交通、场地、通讯及能源供应等施工条件;2)遵循“有利施工、易于管理、方便生活”的原则,并符合我国有关安全、环保等法律法规及招标文件的有关要求3)营地内各功能区分开布置,相对独立,尽可能减少彼此间作业。4)避免工作时的相互干扰,做到能充分发挥施工、生产设施、设备的能力。5)符合有关安全、消防、卫生和环境保护等专门规定。6)尽可能利用已有的建筑物和场地作为临时建筑物和场地,更要尽量避免产生二次倒运。7)在满足施工需要前提下,尽量减少施工用地,不占或少占农田,施工现场布置要紧凑合理。
43、8)合理布置生产机械和各项施工设施,科学规划施工道路,尽量降低运输费用。9)因地制宜、因时制宜、有利生产、方便生活、易于管理、安全可靠、经济合理。10)注重环境保护、减少水土流失。11)充分体现人与自然的和谐相处。(3)施工营地规划根据工程施工内容,按实际场地情况布置生产加工区、项目经理部及民工生活区等。1)生产加工区生产加工区布置:根据施工内容相应的选择布置混凝土搅拌机、砂浆搅拌机、水泥仓库、砂石堆料场、钢筋模板加工场等。2)项目经理部项经理部设置办公室、项目经理办公室、业主监理办公室、管理人员宿舍、娱乐室、食堂、杂物仓库、浴厕等设施,拟租用水库旧管理房设置项目经理部。3)民工生活区设置:民
44、工生活区设置:民工工棚、民工食堂、民工浴厕、工具房等。3.2 施工总进度3.2.1 施工总进度表序 号项目名称开工时间完工时间1大坝加固工程2011年7月15日2011年8月15日2高压灌浆工程2011年3月29日2011年6月20日3溢洪道加固工程2011年4月1日2011年8月9日4防汛抢险公路维修工程2011年9月1日2011年10月12日5房屋建筑工程2011年6月6日2011年8月16日本工程合同工期:2011年2月28日开工,2011年7月28日完工,合同工期151天。实际开工日期为2011年3月28日,2011年10月12日工程完工,实际工期196天,工程延期45天完成。3.2.
45、2 影响工程进度的主要原因(1)坡脚水库施工过程中受附近村民群众干扰,工程不能按照我施工方实施的施工进度计划进行施工,导致工期延误。(2)坡脚水库施工过程中经常遭受停电,导致工期延误。3.2.3实际完成情况与阶段施工进度(1)大坝加固工程:从2011年7月15日至2011年8月15日共计30天。(2)高压旋喷灌浆工程:从2011年3月29日至2011年6月20日共计81天。(3)溢洪道加固工程:从2011年4月1日至2011年8月9日共计132天。(4)防汛抢险公路维修工程:从2011年9月1日至2011年1月12日共计44天。(5)房屋建筑工程:从2011年6月6日至2011年8月16日共计
46、53天。分部工程、单位工程以及外观质量评定于2011年10月31日进行完工验收。3.2.4 主要完成工程量及投资3.2.4.1 主要完成工程量表1 主要完成工程量表如下序号工程项目名称单位工程量序号工程项目名称单位工程量1机械挖运土方m31254.489风钻钻锚筋孔m1486.252石方开挖m3499.6410砂浆锚杆安装根22993回填土方m3942.1311钢筋制作安装t19.2514高压旋喷灌浆钻孔m3804.4212充填灌浆m965高压旋喷灌浆m3446.4213泥结石路面m235006M7.5浆砌石底板m3775.2514管理房面积m2607C20底板砼m3439.6915白蚁防治m
47、28043.838C20挡土墙砼m3926.713.2.4.2 完成投资本工程施工合同中标总价为3467834.00元,采用固定单价承包合同。工程完工后根据实际完成的工程量进行了初步结算,工程结算暂定价为4147086.00元。待工程结算报送审计后,按审计部门审计结算为准。4 主要施工方法4.1 大坝加固工程4.1.1 工程主要建设内容高压旋喷灌浆,旧涵管充填灌浆等。4.1.2 施工过程(1)高压旋喷灌浆施工方法根据工程的施工特点,首先根据施工图纸进行放样定位,高压旋喷施工采用三重管法施工。喷嘴直径为1.82mm,每孔先从坝顶喷灌平台上钻孔,钻到设计深度后,穿过坝体进入基岩喷管下入孔底,按先送气,次送水,后送浆、喷管原位旋转的步骤,自下而上进行旋喷作业,直至设计桩顶高程。每项孔旋喷结束后,及时向孔内回灌,保证桩顶密实。2、旋喷灌浆施工程序钻机就位按施工图纸规定的桩位进行放样定位,其中心误差不大于5cm,然后将钻机安装在设计的孔位上,使其钻杆轴线垂直对准钻孔中心位置,校正水平,成孔偏斜率不大于1.5%。钻孔钻孔施工采用150型地质钻机钻孔,泥浆护壁,确保孔壁稳定。下喷管当钻孔完成后,拔出钻具,换上旋喷管下入设计深度,为防止泥沙堵塞喷咀,应边射水,边下管,水压力控制在1Mpa以内,以避免水压力过高,将孔壁射塌。旋喷作业当旋喷管下入预定深度后,立
链接地址:https://www.31doc.com/p-2054630.html