【課件】CDM项目设计The CDM project design.ppt
《【課件】CDM项目设计The CDM project design.ppt》由会员分享,可在线阅读,更多相关《【課件】CDM项目设计The CDM project design.ppt(20页珍藏版)》请在三一文库上搜索。
1、2019/6/27,Slide 1,CDM项目设计 The CDM project design,中国CDM能力建设项目培训讲义 Training Material Building Capacity for the CDM in China,http:/ 2,CDM项目流程: The CDM Project Cycle,设计,审定/注册,监测,核查/认证,签发CERs,PP: 项目参与方 DOE:指定经营实体 EB: 执行理事会 CER: 经核证的减排,http:/ 3,项目参与者:Project participants,项目参与者或是指一参与CDM项目活动的缔约方,或指经某缔约方批准在该
2、缔约方负责之下参与CDM项目活动的私营和/或公共实体。 In accordance with the use of the term project participant in the CDM modalities and procedures, a project participant is either a Party involved or, in accordance with paragraph 33 of the CDM modalities and procedures, a private and/or public entity authorized by a Party
3、 to participate, under the Partys responsibility, in CDM project activities. 项目参与者是指就如何分配所考虑的项目活动产生的CERs 作出决定的缔约方或私营和/或公共实体。 Project participants are Parties or private and/or public entities that take decisions on the allocation of CERs from the project activity under consideration.,http:/ 4,项目设计文件
4、:第二版, 2004年7月1日: Project Design Document:version 02, July 1, 2004,项目活动的一般性说明 基准方法学 项目活动的起始与期限/减排额计入期 监测方法学和计划 温室气体排放计算 环境影响 利害相关方的评价 附 件 附件1:项目活动参与方的信息 附件2:政府官方提供资金的信息 附件3:新基准线方法学 附件4:新监测方法学 附件5:表格:基准线数据,General description of project activity Baseline methodology Starting date and duration of the p
5、roject activity/Crediting period Monitoring methodology and plan Calculations of GHG emissions Environmental impacts Stakeholder Comments Annexes Annex 1: Information on participants in the project activity Annex 2: Information regarding public funding Annex 3: New baseline methodology Annex 4: New
6、monitoring methodology Annex 5: Table: Baseline data,http:/ 5,基本原则:General principles,完整性:Completeness 精确性:Accuracy 可比性:Comparability 透明性:Transparency,http:/ 6,完整性:Completeness,涡轮机、加热过程、锅炉等 Turbines, process heaters, boilers etc. 燃烧 Flaring 溢散排放 Fugitive emissions 焚化 Incinerators 化学反应的挥发 Chemical pr
7、ocess vents 运输 Transport 能源输入/输出 Imported/exported energy,充分考虑并报告在确定范围内所有温室气体排放的源及活动,并对任何排除在外的情况予以说明。 Account for and report on all GHG emission sources and activities within the chosen project boundary. Disclose and justify any specific exclusions.,http:/ 7,精确性:Accuracy,精确性问题可分为:Accuracy can be cla
8、ssified into: 误差 Errors: 计算误差 (不正确的因子、假设) Calculation errors (inappropriate factors, assumptions etc) 在确定基准或排放时缺乏透明性:Lack of clarity within the methods for determining GHG emissions or baselines 数据管理的弱点(如人工转记误差):Data management weaknesses e.g. manual transposition errors 不确定性 Uncertainties: 技术限制: Te
9、chnological limitations 缺少数据来源:Lack of source data,所有通过计量、计算、估算的温室气体在纪录、运算、汇总和报告的过程中力求正确。 Accuracy means that (e.g.) the GHG data is recorded (through measurement, calculation, estimation), processed, reported and aggregated accurately.,http:/ 8,透明性:Transparency,所有的假设应清楚地说明 All assumptions are clear
10、ly stated 所有背景资料引用应清楚 All background material is clearly referenced 使用方法及选择原理应予解释 The rationale for selection and use of methodologies, as well as the use of such are clearly explained 对讨论的问题应有一个清楚地结论 There is a clear conclusion or decision from all presented discussions 所有使用的公式应予规定 All formulas use
11、d for calculations are stated 所有的计算应是具体的 All calculations are incorporated or referenced 保密信息应清楚识别 Confidential information is clearly identified,http:/ 9,良好的项目设计实践:Good Practice for project design,确定职责 Define Responsi-bilities,识别排放源Identify GHG Emission Sources (基准与项目) (Baseline and project),确定计算方法
12、Determine GHG Calculation Methods (基准与项目) (Baseline and project),计算排放量 Calculate Emissions,汇总/总排放整理Collation/ Aggregation of Total Emissions,保持文件体系 Maintain Supporting Documen- tation,汇整PDD或监测报告 Finalise PDD or monitoring Reports,评审并改进报告Review and improve the report,http:/ 10,PDD A项:项目活动的一般性说明 PDD S
13、ECTION A: General description of project activity,A.1 项目活动名称:Title of the project activity: A.2. 项目活动描述:Description of the project activity: A.3. 项目参与方: Project participants: A.4. 项目活动的技术说明:Technical description of the project activity: A.4.1.项目活动的地点:Location of the project activity: A.4.2.项目活动类别: C
14、ategory(ies) of project activity: A.4.3.项目活动将采用的技术:Technology to be employed by the project activity: A.4.4.简要解释拟议的清洁发展机制项目活动将如何减少人为温室气体源的人为排放量(包括说明为什么当没有拟议的项目活动时就不会发生相应的减排量,要考虑到国家和/或部门政策和实情): Brief explanation of how the anthropogenic emissions of anthropogenic greenhouse gas (GHGs) by sources are
15、to be reduced by the proposed CDM project activity, including why the emission reductions would not occur in the absence of the proposed project activity, taking into account national and/or sectoral policies and circumstances: A.4.5.项目活动的政府官方融资:Public funding of the project activity:,http:/ 11,PDD
16、B项:适用的基准线方法 PDD SECTION B: Application of a baseline methodology,B.1. 应用于该项目活动的方法学名称和参考文献: Title and reference of the approved baseline methodology applied to the project activity: B.1.1.选择该方法学的理由和为什么它可适用于该项目活动 Justification of the choice of the methodology and why it is applicable to the project ac
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 課件 【課件】CDM项目设计The CDM project design 项目 设计 The
链接地址:https://www.31doc.com/p-3029116.html