1、专业文献翻译题 目: Talking about Chinas concrete simple bridgeconstruction technology anddevelopment 系: 建 筑 工 程 学 院 专业: 土 木 工 程 班级:学生姓名: 导师姓名: 完成日期: Talking about Chinas concrete simple bridge construction technology and developmentWith the advances in technology, the original concrete simple bridge has bee
2、n the method of classification does not reflect advances in technology, for the sake of it may wish to support in-situ into law, the entire hole and the erection of mobile die-law category. This paper on the concrete simple bridge of the construction method at the introduction and conclusion, the co
3、nstruction programme with a view to the formulation and implementation of the guiding role. 1 stent in-situ law Stent in-situ means that the law under the beam Erection stent to support the template of reinforced concrete pouring and other working load, the last bridge with the construction method.
4、Although the stent is a temporary structure construction, but it affects body mass and beam construction safety, must be taken seriously. General should note the following issues: (1) sufficient strength, rigidity and stability. Support must be reliably withstand the construction process may have in
5、 the various loads, and the load type and size of the estimate is the key, according to construction specifications and construction experience to be confirmed; stent to be based on reliable, based on the results of the stent, for the most Adverse conditions on the basis of design, and the foundatio
6、n to carry out the necessary treatment; temporary structure in the component connection is to ensure that the key to overall stability, we must ensure that the connection point of security, and have enough vertical, horizontal, ramps connecting rod Pieces and prevent the emergence of the overall fai
7、lure or partial failure. Generally speaking, the strength of support more easily be guaranteed, but with the stability often overlooked. The reason is that the structure of the stability of the more difficult to calculate, but with the emergence of large-scale commercial software, the problem was gr
8、adually resolved more important for the stent, when there is no absolute grasp on stability, simulation analysis should be conducted. (2) determine the elevation model legislation. Most bridges have a design in the pre-camber (Chang said the design of pre-arch), and will support a variety of loads i
9、n the role of deformation and therefore have to consider the impact that the stent deformation Oxfam The pre-camber. During the construction, must be calculated pre-construction and design of the arch-arch, to determine the correct elevation model legislation, thus guarantee a bridge to meet the des
10、ign and specifications of the line. To obtain a more precise construction Pre-camber, if necessary, to support pre-pressure testing, to determine the support of non-elastic deformation and elastic deformation values, to validate construction in the calculation of the various parameters. (3)-dumping
11、equipment. To set up the in-situ stent-disposal equipment, should be charged-symmetrical, uniform, the main beam to prevent a partial stress. The past with equipment commonly used for dumping sand wedge and extinguishers, and Jack now use standard equipment with dedicated equipment. Although the str
12、ucture did not support the number of changes, but the equipment used by the stent than the last great changes have taken place. Now commonly used standard equipment fight stent group, such as steel pipe bowl button up scaffolding, universal members, Bailey beam, June 4 military-beam, entry steel tru
13、ss girder, August 7-steel girder, 6 August 3 and 5 Tun Tun, and so on, all construction units according to their actual situation in which the use of one or more of the fight stent group. Using standard equipment group fight stent, the construction speed, high-intensity support, good stability, and
14、a A better economic performance. Construction of the bridge in the city, the bridge generally is not high, so use a large bowl button up pipe scaffolding, to use its adjustable entrusted with the elevation of adjustment and hold-off is very convenient in a Traffic flow, the use of beam support and m
15、ilitary pier with a certain clearance. Support cast-in-place method, the key is to fight stent group, should give full consideration to load and strengthen structural connections, a detailed analysis to ensure construction safety and quality. 2-erection of the entire law Whole-building method is use
16、d factory-prefabricated beam, beam will be transported to the bridge site and install in place of the way. Such methods in the erection of the main truck crane, gantry crane erected across the bridge, bridge-building species. When the water underneath and relatively flat, long-span beam can be used
17、for small truck crane, long-span beam or the beam of a heavier-span bridge can gantry crane. When the bridge traffic should not be interference, or bridge deep ditch in the water, and other conditions do not allow the scene when it needs a top-that is, a bridge-building. In what way, shape according
18、 to the site, equipment and beam-weight, comparison, the erection of a more economic way, the following major highway bridge and its turn to the domestic Bridge-assembled and can be divided into standard Two. Main bridge assembled using standard equipment, to be based on size and weight-beam bridge
19、machine assembled at the main beam (Introduction beam), corresponding to the configuration of lifting up and running installations, leading to erection of Liang. I. Liang used equipment for the Bailey-general, universal members, military beam, Bailey guided-span beam bridge as applicable in the foll
20、owing 30 m; universal members guided beam bridging a more flexible, larger scope of application of the span, but Rod bolts for the fight even larger group workload; military Liang Liang Bridge-guided groups fight one, and a single-layer or double-military fight Group I. Liang Liang, its application-
21、span Fan widely, from 16 m to 50 m are Can, lifting capacity can be guided through the beam by a few films more easily be guaranteed 7. Assembled Bridge-the sudden advantage of convenient transportation, the group fight simple, Jianzuo other structural weaknesses so that the degree of mechanization
22、is not standard bridge machine, but because of the single economic good works in our country to play a bridge-building Focus on use. In the standard bridge machine, in 1992 developed a JQG80 highway bridge machine, then have produced a series of bridging DF-EBG series of bridges, erected to beam-ton
23、nage 400 1600 k span for the erection of 20 50 m, both From the structural form of-way or have different levels of innovation. The current standard of the bridge structure form the main difference is that bridging the vertical plane on the way major shiftwalker and vertical shiftthe cantilever rail
24、line-shift kind of vertical.largest cantilever rail line-vertical shift means a low center of gravity, light weight, can build a smaller radius of the curve bridges merits, its shortcomings are cantilevered vertical axle load larger shift in the course of the bare-beam may have been caused Harm, to