1、IKEA SHANGHAI SERVICE OFFICE IKEA SHANGHAI SERVICE OFFICE RENOVATION PROJECT IKEA SHANGHAI SERVICE OFFICE RENOVATION PROJECT技术标TECHNICAL PROPOSALContents目 录ChapterI Overview of Project第一章、工程概况(一)、Overview of Project工程概况(二)、Main contents of construction主要施工内容(三)、Feature of construction site and analy
2、sis on surrounding environment 施工现场特征及周边环境分析(四)、Analysis on project feature工程特点分析Chapter Plans of Water and Power Utilities and Temporary Facilities of Construction第二章、施工用水、用电、临时设施及专项重点控制方案1、Plan of construction water utility 施工用水方案2、Plan of construction power utility 施工用电方案3、Plan of toilet sanitary
3、 fixture 厕所卫生设施方案4、Construction Plan in Rainy Season专项重点控制方案5、Schedule of labour configuration (Refer the figure below) 劳动力配置计划(见下表)6、Schedule of machine and equipment configuration (Refer the figure below) 机械设备配置计划(见下表)ChapterSecurity, Construction Term, Quality Target and Assurance Methods第三章、安全、工
4、期、质量目标及保证措施(一)、Safety and civilization in construction 安全、文明施工1、Targets of safety and civilization in construction 安全、文明施工目标:2、Assurance methods of safety and civilization in construction 安全文明施工保证措施3、Fire protection methods 防火措施4、Civilization in construction 文明施工(二)、Construction term 工 期1、Target of
5、general construction programme 施工总进度目标2、Insurance methods of construction programme 施工进度保证措施(三)、Quality 质量1、Quality target of construction 施工质量目标2、Specifications and codes for implement 执行规范标准3、Quality assurance methods 质量保证措施3.1 Preparatory work before construction 做好施工前的准备工作:3.2 Strictly carry out
6、 management system for materials and equipment 严格执行材料设备管理制度:3.3 Strictly master link of quality inspection 严把质量检查关3.4 Take much attention and do well in the protection of finished product 高度关注成品保护,做好成品保护工作ChapterMethods of Environmental Protection during Construction第四章、施工过程中的环境保护措施Chapter Construct
7、ion Plan of Main Separate Works 第五章、主要分部分项工程施工方案Chapter Security Assurance System第六章、管理程序及内容Chapter Methods of Material And Tool Storage on Site第七章、施工现场料具存放方法ChapterSecurity Assurance System第八章、安全保证体系1、Security management network of contractor 承包商安全管理网络图2、Organization table of security assurance for
8、 project department 项目部安全保证机构表3、Table of security factor and responsibility distribution 安全要素及职能分配表4、Detailed implement methods of security for important parts 重点部位具体安全实施措施4.1 Ascent And Hanging Operation 攀登、悬空作业4.2 Protection of Crossing Operation 交叉作业防护4.3 Fire Proof 防火4.4 Security of Machine And
9、Equipment 机械设备安全ChapterCivilized Construction of Site第九章、现场文明施工1、Inspection procedure of civilized construction 文明施工检查程序2、Assurance system of organizing civilized construction 文明施工组织保证体系3、Methods of civilized construction 文明建设措施4、Management methods of the sanitation of construction site 施工现场卫生的管理措施C
10、hapter Quality Assurance System第十章、质量保证体系1、Quality supervision network of contractor (refer the attached figure)承包商质量监督网络图(见附图)2、Figure of management organization of project quality( refer the attached figure)项目质量管理机构图(见附图)3、Overall measures 总体措施4、Varies quality management systems 各种质量管理制度:5、Technic
11、al management 技术管理Chapter Resumes of Contractors Management Team第十一章、承包商项目管理团队简历Chapter Contractor Business Documents第十二章、承包商企业文件Annex 1 General layout of construction Arrangement Plan附件一、施工总平面布置图Annex 2 General Programme of construction附件二、施工总进度计划Annex 3 Organization table of security assurance for
12、 project team附件三、项目部安全保证机构表Annex 4 Quality supervision network of contractor附件四、承包商质量监督网络图Annex 5 Organization figure of project quality management附件五、项目质量管理机构图Annex 6 Certificates of project manager附件六、项目经理资质证书第一章、工程概况 Dear respected specialists:各位尊敬的专家:We sincerely appreciate your coordination and
13、 instructions on the tender activities!真诚地感谢你们对我公司的关怀与指导!Upon receipt of “CLIENTS” tender documents for “IKEA SHANGHAI OFFICE RENOVATION”(include. Drawings and addendums), Shanghai Power Construction Decoration Engineering Co. LTD (Power in short hereafter), have done extensive research and analysis
14、 to the tender information as well as full survey of field site with project quality、progress、safety & environment protection as perquisite, Power ,who will incorporate our comprehensive capability and CLIENTS up-to-date requirements &variation of project, is committed readily to carry on the projec
15、t task with details herein, as follows:接到“宜家办公楼装修工程”的有关招标资料、设计图后,我们进行了认真的研究与分析;我们考察了施工场地特征,在结合改造工程与发展新情况基础上,凭借公司的综合实力,在确保工程质量、工期、安全、文明施工和回访服务的前提下,进行了商务与技术的投标工作,如有幸中标,我司将按照招标文件要求恪守投标承诺承接本工程。(一)、Project outline工程概况The project location is No.128 Caoxi Road, Shanghai. It is IKEA office building with 7 s
16、toreys. The building will match IKEA image and function after renovation. Main works of project goes as follows:该工程位于上海市漕溪路128号。本建筑为宜家家居的办公楼,是一幢7层框架结构建筑。通过对该建筑物的装修,使之符合宜家的形象与功能的要求。本工程主要施工内容综述如下:(二)、Main construction activities主要施工内容1、Civil construction: open hole on floor slab of 6F and 7F; construc
17、tion of 3F, 4F and 5F stair; transportation and installation of steel I-beam; demolishment and movement of wall;土建:六楼、七楼楼板开洞并增加楼梯;三、四、五楼楼梯施工;工字钢梁运输安装;墙体拆除、移动;2、Finish: ceramic tiles, ceramic skirting, carpet lying; interior wall paper and painting; light steel stud frame gypsum board ceiling; T type
18、 stud frame mineral wool board ceiling; ceramic tile wall, veneer of lift lobby; installation of door, window and movable white board; painting, emulsion;装饰:瓷砖地面、瓷砖踢脚线、地毯铺设;内墙墙纸及涂料;轻钢龙骨石膏板吊顶;T型龙骨矿棉板吊顶;瓷砖墙面、电梯厅饰面;门窗安装、活动白板安装;油漆、乳胶漆;3、M & E: water supply & drainage system; HV & LV power distribution s
19、ystem; FAS system;机电:给排水系统;高低压配电系统;火灾自动报警及联动系统。(三)、Trait of field site and surrounding environment analysis 施工现场特征及周边环境分析1、The project is IKEA office renovation. Existing water supply system and power supply system can be used temporarily. The office building is located on Caoxi Road, with wide circ
20、ular roadways the traffic for loading and unloading, is available easily.本工程为宜家办公楼改建工程,办公楼原供水、供电系统可供施工临时使用;该办公楼位于漕溪路上,交通便利,材料装卸相对方便,但施工现场垂直运输工作量较大。2、All construction activities can be arranged accordingly with the shift of four seasons in Shanghai.气候条件根据上海市气候特征,按上海市夏秋季节进行合理安排及准备。3、There is no worry
21、about noise disturbance to neighbouring due to night construction activities, and the compact field site lessened the difficulty and complication of the management.施工中大型机械使用较少,故噪声影响相对较小;工作面相对集中,便于管理,总体周边环境情况良好。(四)、Analysis of project 工程特点分析The main figures of the project:本工程的主要特点是:1、Facilities of th
22、e project is used for conference and office, thus the standard for quality and hygienic (environmental) requirement is much higher, also its a must that the equipments and materials meet the foregoing demands本工程设施用于会议、办公,质量、环保要求高,材料及设备必须符合上述质量及环保要求;2、The employer will work during construction, so th
23、e arrangement of construction workers and office staff and control of noise, dust and powder is key point. (measure for separate items is put forward, please refer to Chapter 2 )本工程施工过程中,业主正常办公。故施工人员与办公人员的人员分流调配和施工过程中的噪声与粉尘控制是本工程的重点与难点。(针对上述几点我司制订了部分专项措施,见第二章)3、The project includes digging holes on