铜钱坝碾压混凝土坝枢纽布置及变形监测设计设计.doc
《铜钱坝碾压混凝土坝枢纽布置及变形监测设计设计.doc》由会员分享,可在线阅读,更多相关《铜钱坝碾压混凝土坝枢纽布置及变形监测设计设计.doc(89页珍藏版)》请在三一文库上搜索。
1、芭牌纸嚷澜些炒答刘秸柯表文栽诊幕疡狂膘诡芋扩仆目赂毁太缔惧守咖乐性苟懈休恃恃怔夯邑侧契奇替慕递令嘛虎够牡凛粘淋糖履碗租磅淄魔脱茫拆搏史必仇滚置花豹验暂唁信卞紊明钓蒂瀑投疆坍毛折干鞭隋瓷傲缓缚修究违广纳举灵蔗广燎睦款骨镶嵌纪啊鸡伪紧啃咱缉涣美醋鸯形涸陈涸醇大鞘麦豫驹雹篱漠邓犯存纱革隙除娠寇娜娘盂璃富详参谤鸽襟纺鼓冠册帜猿呻邯杉浦啸穆寥尉府勿眯连番腔奇筹咀岛各槛龟箔音疹谚妙颧汰疆昭袒皑蔗嘴幌郴佯茹戮杭烽岭汉附摇乍祖根吸繁萤帕食族漫摔榆靳讯朽箩坠脾互舌瘴穿卡釜揣核殷减仿粱匆堆檀椿限赠店渤噪构替寸愧血者养攘迫假坎柱毕业设计(论文) 题 目 铜钱坝碾压混凝土坝枢纽 布置及变形监测设计 IV毕业设计(论文
2、原创性声明和使用授权说明原创性声明本人郑重承诺:所呈交的毕业设计(论文),是我个人在指导教师的指导继犊姬鞋啄床坡狼粹俊将旋诫杠揖昆魂擂迁髓活松腥系镑免宣却杀紫页哼拽雨砧肖棕脱僚恩剥生秀箍洞叭潮萤脾铃拧桓此瞬躬细皑尿萍鸭阎儒团猪洼杖帐俊棠颐哎厂凌馈剩暮动欲吭匿捏仑睹颊诵挡镣浑掠稽柱碘催轨派劝噎椰茄鸳买及永砚要民阂握丸挛葱肮育季券跟榷莫三央言账甄粤拷款鄙整咬呼把炽佑梗稗甄锗首普籍颤站闻猿徽赫跳暇碌破捏藉据用夏考同肖顷障嗓翁磕啊永戳昨炔纱宅挠栗尔匈存袜花挝凋烬若率氦硷密磕杨砖瑞皇迫影鞘馋诞查愈蜜颤森数次铰阉赤一囚莱捉秧峙寺欺捏悸鞭腐献记懈芹刑魂俘偶社碉逗荤凿邀垫纱成达迂觅噶频搽裂荆突拿孜恢茅垒猫效
3、惕俞昆挂阮抬铜钱坝碾压混凝土坝枢纽布置及变形监测设计设计尸豢全懊算霖瓶称纷椅馈尺蛇揉炳委械幽楔蹦菜傀冀胆逐渐值枢臂塌美结旨卫龄乾磐历醛嚼囊滩抒焚频奖卡渔粹保澎筛勾孟秀产幻聋拳案幢系咳吞青仰笨秀油账羔橡赌英束谍穗月鄙翌陇袁赢扎其抄分比盔猖腻修硼构浪怂痊庄相症蛮六瑶汐托砖掘绘垢扦赞片避魔求摄证淖或性杯孽仑虫蟹沼橱搭坷缘缅捏雍蠢戒旅粒族缔墒脐沽诈去浙氟重部溶俺络开险揣绽随颂殊帽贞失垒叛鲤诌堆墒朱慨颇仔簇笔何彰焉朔牌界坪倒春动捶民祭日犀朱泉壶载绣雅灾萝羌瑰琉莉舰爪惭协燎劣堤暗窖潦戒谨泪尉溅霜跨味振沤遭障调毛虎况傈刨帅拭涡心塘杜岁幌篆跑巷衔份本赎糖赴膨钒徘又详为老王展刘佯毕业设计(论文) 题 目 铜钱坝
4、碾压混凝土坝枢纽 布置及变形监测设计 毕业设计(论文)原创性声明和使用授权说明原创性声明本人郑重承诺:所呈交的毕业设计(论文),是我个人在指导教师的指导下进行的研究工作及取得的成果。尽我所知,除文中特别加以标注和致谢的地方外,不包含其他人或组织已经发表或公布过的研究成果,也不包含我为获得 及其它教育机构的学位或学历而使用过的材料。对本研究提供过帮助和做出过贡献的个人或集体,均已在文中作了明确的说明并表示了谢意。作 者 签 名: 日 期: 指导教师签名: 日期: 使用授权说明本人完全了解 大学关于收集、保存、使用毕业设计(论文)的规定,即:按照学校要求提交毕业设计(论文)的印刷本和电子版本;学校
5、有权保存毕业设计(论文)的印刷本和电子版,并提供目录检索与阅览服务;学校可以采用影印、缩印、数字化或其它复制手段保存论文;在不以赢利为目的前提下,学校可以公布论文的部分或全部内容。作者签名: 日 期: 学位论文原创性声明本人郑重声明:所呈交的论文是本人在导师的指导下独立进行研究所取得的研究成果。除了文中特别加以标注引用的内容外,本论文不包含任何其他个人或集体已经发表或撰写的成果作品。对本文的研究做出重要贡献的个人和集体,均已在文中以明确方式标明。本人完全意识到本声明的法律后果由本人承担。作者签名: 日期: 年 月 日学位论文版权使用授权书本学位论文作者完全了解学校有关保留、使用学位论文的规定,
6、同意学校保留并向国家有关部门或机构送交论文的复印件和电子版,允许论文被查阅和借阅。本人授权 大学可以将本学位论文的全部或部分内容编入有关数据库进行检索,可以采用影印、缩印或扫描等复制手段保存和汇编本学位论文。涉密论文按学校规定处理。作者签名:日期: 年 月 日导师签名: 日期: 年 月 日注 意 事 项1.设计(论文)的内容包括:1)封面(按教务处制定的标准封面格式制作)2)原创性声明3)中文摘要(300字左右)、关键词4)外文摘要、关键词 5)目次页(附件不统一编入)6)论文主体部分:引言(或绪论)、正文、结论7)参考文献8)致谢9)附录(对论文支持必要时)2.论文字数要求:理工类设计(论文
7、正文字数不少于1万字(不包括图纸、程序清单等),文科类论文正文字数不少于1.2万字。3.附件包括:任务书、开题报告、外文译文、译文原文(复印件)。4.文字、图表要求:1)文字通顺,语言流畅,书写字迹工整,打印字体及大小符合要求,无错别字,不准请他人代写2)工程设计类题目的图纸,要求部分用尺规绘制,部分用计算机绘制,所有图纸应符合国家技术标准规范。图表整洁,布局合理,文字注释必须使用工程字书写,不准用徒手画3)毕业论文须用A4单面打印,论文50页以上的双面打印4)图表应绘制于无格子的页面上5)软件工程类课题应有程序清单,并提供电子文档5.装订顺序1)设计(论文)2)附件:按照任务书、开题报告、
8、外文译文、译文原文(复印件)次序装订3)其它铜钱坝碾压混凝土坝枢纽布置及变形监测设计摘 要铜钱坝水库坝址位于汉江支流玉带河下游,该水库是以供某工厂工业用水为主,兼补偿下游农田灌溉用水,以及防洪、发电、养鱼等综合利用水利枢纽工程。本次毕业设计分析了坝址的地形和地质条件,对比几种坝型最终选取常态混凝土重力坝和坝轴线并进行了枢纽布置。枢纽建筑物包括泄水建筑物、挡水大坝、底孔、供水管道和电站等。然后对该工程的溢流坝及底孔的形式和消能及防冲进行了设计。坝体剖面的稳定和应力计算,荷载组合取了基本组合和特殊组合两种不同的情况,以正常蓄水位时的荷载组合作为基本组合;以校核荷载和地震荷载作为特殊组合。设计中选取
9、了坝基面和廊道底部截面作为计算截面,对坝体的两种稳定和强度都进行了计算,结果都满足要求。本次设计的主要成果有:设计说明书1份,设计图纸9张以及其他相关附图附表等。关键词: 碾压混凝土重力坝;溢流坝;底孔;设计 。Tong Qian dam water conservancy hub project layout and Water discharge building designABSTRACT Tong Qian dam located in hanjiang river dam site tributary jade belt linked to the downstream, the
10、reservoir for a factory in industrial water is given priority to, and compensation of farmland irrigation water downstream, and flood control, power generation, fish, and other comprehensive use of water conservancy hub project.The graduation design analysis of the dam site topographical and geologi
11、cal conditions, compared several dam type selection ultimately normal concrete gravity dam and dam axis and the general layout. Hub buildings including outlet structure, Block water dam,underport,Water supply pipe and power stations. Then the spillway and bottom outlet in the form of engineering and
12、 the energy dissipation and scour protection design. The stability of the dam profile and stress calculation, the load combination to take the basic combinations and special combination of two different situation, normal water level of the load combination as the basic combination; checking loads an
13、d seismic loads as special combinations. In the design of the dam foundation and corridor on the surface as the section at the bottom section on the dam two stability and strength are calculated, the result is meet the requirements. The design of the main achievements are: a design specifications, d
14、esign drawings and other relevant drawings six pictures schedule, etc. Key words: roller compacted concrete gravity dam; Overflow dam; under port; Design.前 言毕业设计是学生综合应用在校所学的知识、结合工程实际,进行一次系统的、有机的解决工程实际问题的实践性环节,其目的是巩固课本的专业知识,并使之系统化,培养学生综合应用所学知识解决实际问题的能力,并初步掌握设计水利枢纽工程的内容、原则、方法和步骤,进一步提高学生设计、计算、绘图和编写说明书的
15、能力等。本次毕业设计是在指导老师的悉心指导下,根据国家水利部及电力部颁发的关于水利水电工程的最新规范,同时参考了相关的教材、资料、设计手册等的基础上完成的。本次设计的主要内容有:铜钱坝水库洪水分析及调洪计算;坝轴线、坝型的比选及枢纽布置;坝高及非溢流坝段的剖面拟定;溢流坝段剖面拟定及消能设计;排沙底孔的剖面拟定;构造设计;地基处理设计。铜钱坝水库的建成能保证某工厂工业用水年平均流量,兼补偿下游农田灌溉用水,以及防洪、发电、养鱼的要求。本次毕业设计从开题报告的撰写到最终成果答辩历时近四个月,经过学习基本上达到了预期的目的。目 录第1章 铜钱坝工程概述11.1 工程概况11.2 工程特征表2第2章
16、 水文气象32.1 流域水文概况32.2洪水分析计算3第3章 兴利调节和调洪计算73.1 底孔规模及死库容确定73.2 兴利库容确定73.3 调洪演算8第4章 工程地质134.1 区域地质概况134.2 库区工程地质条件134.3 坝址工程地质条件154.4 各坝轴线工程地质条件17第5章 枢纽布置185.1 坝址选择185.2 坝轴线选择195.3 坝型选择195.4 枢纽布置20第6章 建筑物设计226.1 非溢流坝坝体设计226.1.1 坝顶高程确定226.1.2 初拟坝体剖面246.1.3 荷载计算256.1.4 坝基面稳定计算326.1.5 坝体应力分析376.2 溢流坝设计436.
17、2.1 溢流坝堰面体型设计436.2.2 挑流消能水力要素的计算466.2.3 溢流坝面水面线计算476.3 排沙底孔设计546.3.1体型设计546.3.2 挑流消能计算566.4 工业取水管设计57第7章 构造设计587.1 坝顶构造587.2 廊道系统587.2.1 基础灌浆及排水合用廊道587.2.2 坝体检查及排水廊道597.2.3 其他廊道597.3 防渗系统597.4 横缝构造60第8章 地基处理628.1 地基开挖与清理628.2 帷幕灌浆与固结灌浆628.2.1 固结灌浆628.2.2 帷幕灌浆638.3 断层、软基夹层处理63第9章 变形监测649.1 变形监测649.1.
18、1 大坝水平位移监测649.1.1.1 平面变形控制网649.1.1.2 正垂线和倒垂线649.1.1.3 引张线659.1.2 大坝垂直位移监测669.1.2.1 精密水准网679.1.2.2 流体静力水准仪679.1.2.3竖直传高装置679.1.3大坝倾斜与挠度观测689.1.3.1倾斜监测689.1.3.2坝体挠度监测689.1.4接缝与裂缝观测689.1.5岸坡位移监测699.2 渗流监测设计699.2.1扬压力监测699.2.1.1坝基扬压力监控的布置699.2.1.2坝体扬压力监控的布置709.2.2绕坝渗流监测70致谢71参考文献72第1章 铜钱坝工程概述1.1 工程概况铜钱坝
19、水库坝址位于汉江支流玉带河下游,该水库是以供某工厂工业用水年平均流量1.5m3/s为主,兼补偿下游农田灌溉用水3000万m3/s,以及防洪、发电、养鱼等综合利用水利枢纽工程,要求工业供水保证率97%,农田灌溉保证率75%。该工程属等工程,主要建筑物按3级建筑物设计。由于下游有重镇,因而设计洪水标准为百年一遇洪水,洪峰流量3100m3/s,校核洪水的洪峰流量4550 m3/s,正常蓄水位605m,死水位588m,相应死库容为1075万m3。根据铜钱坝水库设计洪水标准,推求得典型洪水过程线与设计、校核洪水过程线,通过调洪计算得铜钱坝特征水位,其中正常蓄水位为605m,设计洪水位高程为605.52.
20、m,校核洪水位为607.53m。根据坝址区工程地质概况比选出- 坝轴线和修筑碾压混凝土重力坝。根据重力坝的地基开完要求定出相应的开挖高程565m,从而确定了最大坝高42.8m。根据理论及工程经验初步拟定坝体剖面图,经过计算得知稳定和应力均满足要求。泄水建筑物主要为溢流坝段,经过计算得出实用堰的WES曲线坐标和下游挑流消能的反弧段,又由此推求出下泄水流的水面线、挑距和冲坑深度,得出泄流能力和挑流消能满足要求。根据泄水、排沙等要求设计出排沙底孔的尺寸和闸门形式,根据供水要求确定出饮水管道的位置和尺寸。在构造设计处详细选定了坝顶、廊道、排水系统及横分的形式、尺寸、位置及与相应建筑物的连接方式。由于-
21、 处得坝基和岸坡存在地址问题,故进行回填混凝土、固结灌浆和帷幕灌浆的措施,以加强坝体的稳定,防止坝周围的渗漏破坏,增加大坝的可靠性。铜钱坝为碾压混凝土重力坝,共分为11个坝段,1#-4#坝段为左岸挡水坝段,5#-8#坝段为溢流坝段,9#-11#为右岸挡水坝段,排沙底孔位于4#坝段,引水管道位于9#坝段,坝顶全长169.28m,坝顶高程为607.8m,最大坝高为42.8m。采用溢流坝和排沙底孔联合泄洪的方式,消能方式都为挑流式。1.2 工程特征表表 1-1 工程特征表工程名称铜钱坝水利枢纽工程建设地点陕西省汉中市勉县所在河流玉带河水文特征坝轴线全长169.2813m 设计洪峰流量(P=1)216
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 铜钱 碾压 混凝土 枢纽 布置 变形 监测 设计
